Road system
+ National Route 19B with a width of 80 meters is the main north-south axis of the industrial park
+ Branch roads is 20,27,29,45,56,65 meters wide
+ Lighting is installed on roads
Power supply system
110kV line from 220/110kV station to 110/22kV transformer station with capacity of 2x63 MVA. Capacity can be increased from 150-200 MVA according to investor's needs.
Telecommunication infrastructure
Modern and advanced information technology infrastructure, with high-quality transmission lines, ensures smooth and secure data communication.
Water supply system
The phase 1 booster pump station has a capacity of 24,000 m³ per day and night. Phase 2 has a capacity of 64,000 m³ per day and night.
Drainage and wastewater treatment system
+ The rainwater drainage system is installed along the roads in the industrial zone to ensure proper drainage and prevent flooding.
+ The wastewater drainage system collects the wastewater from the factory and processes it centrally at the industrial park's wastewater treatment plant.
+ The capacity of the wastewater treatment plant in the industrial zone is as follows: Phase 1: 14,000 m3 per day and night; Phase 2: 53,650 m3 per day and night.
Auxiliary services and amenities
+ Customs: Binh Dinh Customs Department at Quy Nhon port.
+ Available banks and financial institutions in Quy Nhon
+ Available major hospitals in the area.